MISCELLANEOUS APPLICATIONS


Doody St Bridge 


           SPECIALTY SKEWED VEE SLAB PANELS FOR ROAD BRIDGE AT DOODY ST ALEXANDRIA FOR HANNANPRINT. NOTE FILLED VOIDS TO ENHANCE SHEAR CAPACITY DURING CONSTRUCTION AND VOIDS REMOVED TO ENHANCE SHEAR FOR SERVICE LOADING, SHEAR CONNECTING REINFORCEMENT EXTENDING IN TO TOPPING SLAB TO ENHANCE SHEAR FATIGUE PERFORMANCE UNDER MOVING WHEEL LOADS.
THIS IS AN EXAMPLE OF THE ADAPTABILITY OF THE VEE SLAB SYSTEM.
VEE SLABS FOR THIS PROJECT WERE SPECIFIED BY THE PROJECT ENGINEERS , HENRY AND HYMAS.

 

DOODY ST ALEXANDRIA ROAD BRIDGE OVER CANAL

 


DOODY ST BRIDGE , UNDERSIDE VIEW OF PANELS FORMING BEAMS AND SLABS. 9.2M SPAN 275MM DEEP VEE SLABS.



DETENTION TANK ROOF LENORE LANE ERSKINE PARK.

CONSULTING ENGINEER: JOHN CAVASINNI AND ASSCOCIATES

THIS PROJECT INVOLVED THE CONSTRUCTION OF A ROOF OVER A ON SITE DETENTION TANK 39 METRES LONG AND 21 METRES WIDE.

THE ROOF NEEDED TO SUSTAIN ONE METRE OF SOIL FILL PLUS 15 KPa OF LIVE LOAD.

600MM SQUARE BLOCK PIERS WERE SPACED ON A 2.4M BY 7.0 M GRID WITH VEE SLABS BEING SUPPORTED ON THEIR CORNERS.

250mm DEEP VEE SLABS WITH 100mm OF TOPPING WERE USED.

VEE SLABS LAID WITH 100mm OF GAP BETWEEN THE ENDS OF PANELS  AND MADE CONTINUOUS FOR LIVE LOAD IN BOTH DIRECTIONS.

 

VEE SLAB PANELS BEING INSTALLED
LENORE LANE ERSKINE PARK. 
VEE SLAB INSTALLATION COMPLETE (10HOURS)

 

ROOF OVER OSD TANK AT OAKDALE FOR DHL.

BUILDER:TAYLOR CONSTRUCTIONS,
CONSULTING ENGINEER: COSTIN ROE .
 


 

THIS TANK IS 67 METRES LONG AND 8.0 METRES CLEAR SLAB.

THE ROOF IS DESIGNED FOR 2 B DOUBLE TRUCKS ANYWHERE AND 25KPa LIVE LOAD ACTING SEPARATELY.

250mm THICK VEE SLABS WERE USED WITH TAPERING TOPPING AVERAGEING 200 mm IN THICKNESS.


VEE SLAB WITH FRAMED PENETRATION BEING LIFTED

OAKDALE OSD ROOF VEE SLABS ERECTED IN BACKGROUND ( NOTE SHEAR CONNECTORS OUT OF VEE SLABS).

SPAN TABLE


Ultimate Moment Capacity per meter completed floor in kN/m width of slab.